The Bakhty – Ayagoz line will open a third railway crossing between Kazakhstan and China
Earthworks on the Bakhty – Ayagoz railway are 92% complete. The 303 km line is expected to enter service in 2027.
The new line will become the third railway border crossing with China: cargo currently passes through Dostyk and Altynkol stations. The crossing will help redistribute cargo flows and take part of the load off the existing checkpoints. The capacity of the new route is expected to reach up to 20 million tonnes a year.
Construction progress
- earthworks are 92% complete;
- engineering structures are being built and the track superstructure laid in parallel;
- 70 km of rail-and-sleeper grid are planned to be laid by the end of the year;
- about 870 units of special equipment and some 1,450 specialists are working on site.
Why the project matters
President Kassym-Jomart Tokayev called the construction of the line strategically important in his Address to the people of Kazakhstan. The ministry expects the route to help increase supplies of Kazakh products to China, attract additional transit and develop trade between the countries.
The dates are planned ones: completion of work and the start of traffic are scheduled for 2027.
What this means for importers and shippers
Shippers between China and Kazakhstan will get one more border crossing point in addition to Dostyk and Altynkol. If the project is launched on time, it may reduce the load on the existing crossings. Until the line enters service, routes are still built through the existing stations.
ZHEBE's view
ZHEBE Logistics follows the development of border infrastructure and will offer clients the new route once the crossing starts operating; for now we organise China – Kazakhstan shipments through the existing crossings.
Author: ZHEBE Logistics editorial team
Related services
Need a quote for your cargo? We'll advise on the route, timing and cost.
Calculate CostMore news
EAEU Customs Code Amendments: First Package Planned for Signing in December 2026
Amendments to the EAEU Customs Code will affect containers, piggyback (contrailer) transport and transit. Signing of the first package is scheduled for December 2026, while the second package is still at an early stage.
Read
Goods Declaration and Transit under TIR Carnets Are Now Processed in KEDEN
Kazakhstan continues to move customs operations to the KEDEN digital system. Since 11 April 2026, the "Goods Declaration" has been processed in it, and the number of integrations with other information systems has reached 59.
Read
Kazakhstan bans imports of fresh chicken eggs for two months: transit is not affected
From 13 November 2026, Kazakhstan has banned imports of fresh chicken eggs for a period of two months. The restriction applies to all modes of transport and to supplies from any country, including EAEU states.
Read